Went into work late today to go check up on the work. Was pleasantly surprised to see that all the hacking was done and the tilers were prepping the walls for tiling. Even more surprised that the plastering works had begun.
Here, the ID had instructed a plumber to create a temp pipe that the workers can use to get water for the cement mixing etc..
The view from the main gate of my house. See the mountain of sand?
The tiles that we had chosen for our MBR toilet. The light blue is for the toilet walls and the black is for the shower area. The floors of both toilets will also be black/dark dark grey tiles.
Another look at the tiles. There are very fine lines/grain design on the light blue tiles.
The view from the MBR toiet facing to the MBR room door. See the big gap on the lef? Thats the 5 foot hole we hacked between the walls of the MBR room and room 2. We intend to put a foldable wooden door there. Reason we decided to hack this is because we wanna put our wardrobe in the next room which will be like a study. Our MBR is small esp after we put our King size bed in so we dun wanna end up squeezing everything in. Furthermore, when we eventually have a baby, that will be the baby's room.. so we have direct access to the room at night and can keep an eye on the little one.
I don't know what you call this but its the edging that they put at the wall edges before they begin platering. We need to plaster our whole house cos its rock stone surface right now. Been advised to cos rock stone surfaces tend to get dirty esily (trap dust) and is damn a pain to paint.
Another look at the edging work.
That's Ah-Chai.. the tiler i think. Malaysian - Chinese
Our kitchen, all hacked and being cemented.
A look into our MBR
The view from the main door
MBR toilet
OK, thats all for now. I think me and wifey will be paying a visit tomorrow to our place again cos she wants to see it for herself. I'll be leaving for an overseas assignment for 3 weeks to London on Monday so wifey will have to overlook the work. I'll be back just in time to go select lights and fan and by the 2nd week of October we should be completed. All looks good so far!
Cheerio. Mr.Wan
Friday, August 29, 2008
Thursday, August 28, 2008
The old....
As promised, here are some pictures of the flat as we bought it!
The entrance to the Kitchen (looked at via the living room)
The living room viewed from the main door area
The old gate
Bedroom 2 viewed from the window (into the living room)
The Kitchen (viewed from the kitchen entrance)
The common toilet
The kitchen viewed from the common toilet entrance
The MBR toilet (ugly pipes)!!
The MBR toilet II
The MBR toilet III
The MBR viewed from the MBR door
Bedroom 2 viewed from the door
next up, stories about house hunting and renovation sourcing!!!!
The entrance to the Kitchen (looked at via the living room)
The living room viewed from the main door area
The old gate
Bedroom 2 viewed from the window (into the living room)
The Kitchen (viewed from the kitchen entrance)
The common toilet
The kitchen viewed from the common toilet entrance
The MBR toilet (ugly pipes)!!
The MBR toilet II
The MBR toilet III
The MBR viewed from the MBR door
Bedroom 2 viewed from the door
next up, stories about house hunting and renovation sourcing!!!!
In The Beginning.....
Well, I thought for the sake of our friends over at Renotalk forums I should start a reno blog. So everyone can tune in to the common issues and problems that couples will face when attempting to recreate their home.
To begin let's have some stats:
HDB 1st Appointment: 10th June 2008
HDB 2nd Appointment: 7th August 2008
Area : Bishan
Type: 4A model ( approx 16 years old)
Area: 103
Renovation Costs: $28550
Renovation ID Firm: renozone
Renovation ID: Louis C
Commencement of renovation: 27/08/08
Here's a picture of our floorplan...
To begin let's have some stats:
HDB 1st Appointment: 10th June 2008
HDB 2nd Appointment: 7th August 2008
Area : Bishan
Type: 4A model ( approx 16 years old)
Area: 103
Renovation Costs: $28550
Renovation ID Firm: renozone
Renovation ID: Louis C
Commencement of renovation: 27/08/08
Here's a picture of our floorplan...
ok, will update next on some pictures of the original condition of the flat.....