So yesterday, me and wife had made an appointment with our ID to meet up at our place to check out the work and discusss some things. Here are some pictures of the work done over the week:
A pic of the kitchen with the tiling completed. Floor tiles in place and we only had to begin discussing specifics about the kitchen cabinet design.
Our MBR with the first coat of paint. Orangey as orange can be....
The adjoining room, in a lovely purple... lavendar or whatever its called..
Our MBR toilet. The tiling came out great. Louis also already put in the shower screen. But the standard shower screen seems to be too low for me and wifey...so we requested for Louis to replace it with a higher one which will go up all the way close to the ceiling...
Another view of the MBR. That briht orange wall is where our bed will face and where we'll place the television...
Another view of Room 2 which is kind of a wardrobe room, study and future baby room... =)
Well, thats that. After visiting the house we went to purchase our lights, ceiling fan and door bell... Another whopping 1000 dollars spent in one afternoon.... sigh... all the costs of renovation... but i guess its well worth it... will update again soon...
cheerio!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment